Starting 1 July 2025, Building Information Modelling (BIM) becomes mandatory for all construction projects in Malaysia valued at RM10 million and above. More details in this article.

This directive, issued under Pekeliling Perbendaharaan PK 1.15, applies to both public and private sector projects. It mandates the use of BIM across the entire project lifecycle from planning to facilities management.

Whether you are a developer, consultant, or facilities team, this shift requires immediate digital readiness.

What the BIM Mandate Means for Your Projects

  1. BIM is required for all new construction and infrastructure projects costing RM10 million or more.
  2. Applies to both government and private sector developments.
  3. Covers buildings, roads, utilities, and sewage infrastructure.
  4. BIM must be used from the design stage through to asset and facility management.
  5. Exemptions must be approved in writing by the Director General of JKR before any procurement or tender process begins.

FOX: Built for the Next Phase of Digital Construction and FM

FOX is a modern, cloud-based asset and facilities management software that helps you operationalise BIM data.

As Malaysia enforces BIM compliance, FOX ensures you are ready to manage and maintain your assets efficiently from day one.

1. Capture and Manage Structured Asset Data

  • FOX supports PeDATA and SKATA-compliant data structures for government and private projects.
  • You can directly import asset data handed over from BIM models.
  • Automatically populate key details such as asset location, type, manufacturer, service schedules, and warranty information.

2. Plan Maintenance with Confidence

3. Improve Post-Construction Handover

  • FOX transforms drawings and models into actionable asset records.
  • Eliminate paper-based documents and disconnected files.
  • Facilities teams receive a complete, usable asset register at CCC stage.

4. Align with Malaysian Standards

  • FOX meets malaysia’s compliance standards including PeDATA and SKATA.
  • Enables reporting and recordkeeping for JKR and other agencies.
  • Suitable for government projects and private sector clients moving towards digital FM.

Why You Should Act Now

  1. BIM is a present-day requirement and now mandatory in Malaysia starting July 2025.
  2. Facilities management must be integrated into the project from the start.
  3. Structured digital handover will become the new industry standard.
  4. Projects without BIM and FM integration risk delays, cost overruns, and non-compliance.

FOX is Ready to Support Your Transition

FOX helps developers, consultants, and facility managers take full advantage of BIM.

We enable seamless transition from construction to operations with data-driven tools that reduce manual work and improve asset performance.

Deploy FOX across your projects whether you’re planning for compliance or pursuing long-term operational efficiency.

Get in Touch

If your project team is preparing for BIM and FM integration, we can help.

Contact us at hello@foxmy.io or request for demo to learn more.

Let’s move your project forward with the right digital foundation.